Faro Olhão WWTP
The Faro-Olhão WWTP was built at the end of 2018, on the site of the old Faro Nascente WWTP, in the Municipality of Faro, approximately 2 km east of the city of Faro, on a plot at the site of Sítio da Garganta, on the bank left of the Seco River, included in the Ria Formosa lagoon zone.
This WWTP treats either part of the wastewater generated in the city of Faro and the Municipality of S.Brás de Alportel and which was sent to the old WWTP of Faro Nascente, by lagooning, or the wastewater generated in the city of Olhão and which were treated at the Olhão Poente WWTP, by lagooning.
With this WWTP it was possible to deactivate the old lagooning systems, which proved to be undersized and inadequate, from the point of view of the level of treatment carried out. Link: https://360.aguasdoalgarve.pt/faroolhao/index.htm
Companheira WWTP – Portimão
The Companheira WWTP is located northeast of the city of Portimão, on the Bom Retiro – Companheira site, on the right bank of the Boina river and south of the EN125.
The wastewater to be treated at the Companheira WWTP comes from the Portimão interceptor system, consisting of a central axis, which includes a gravity collector, in a tunnel, almost 10 km long and with an outer diameter of 1500 mm, in the terminal area of connection to the WWTP. In its entirety, the interceptor system, at its peak, is 79 km long and includes 30 pumping stations. The inflows to this central collector (gravity and elevation) come from the urban agglomerations of the municipality of Portimão, Ferragudo and Parchal, in the municipality of Lagoa and Brejão, Caldas de Monchique and Monchique, in the municipality of Monchique.